USS Alliance: Difference between revisions

Jump to navigation Jump to search
m
Wrong month...
m (Don't ask... ;-))
m (Wrong month...)
Line 3: Line 3:
{{stub}}
{{stub}}


One of the early ships of the Fleet, the '''USS Alliance''' was commissioned originally in March/April of 2372 and lost in February of 2374 after an engagement with a group of Klingon ships. The Captain and First Officer [[Paine, Logan | Logan Paine]] did manage to recapture the Alliance, but at too great of cost. It was decided to decommission the USS Alliance in lieu of the arrival of the [[USS Alliance-A]] shortly after.
One of the early ships of the Fleet, the '''USS Alliance''' was commissioned originally in July of 2372 and lost in February of 2374 after an engagement with a group of Klingon ships. The Captain and First Officer [[Paine, Logan | Logan Paine]] did manage to recapture the Alliance, but at too great of cost. It was decided to decommission the USS Alliance in lieu of the arrival of the [[USS Alliance-A]] shortly after.




2,321

edits

Navigation menu