Za Main Engineering

From 118Wiki
Revision as of 21:20, 16 August 2016 by Yito Seja (talk | contribs) (Created page with "{{Za-nav}} center The engineering section had a major upgrade during the last refit, upgrades were made to the warp drive and impulse engi...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


Challenger engineering.gif

The engineering section had a major upgrade during the last refit, upgrades were made to the warp drive and impulse engineers. New computer panels were installed and engineering was extended to provide space for the slipstream drive and open up extra engineering work spaces.

The chief engineer's office can also be access through engineering.