Za Bridge

From 118Wiki
Jump to navigation Jump to search


Zabridge.jpg

The bridge of the Za was completely overhauled during its last refit. Now, it's been brought up to contemporary standards with the functionality, design, and comforts associated with ships newly commissioned in the late 2380s and early 2390s. The assigned consoles are labeled in the drawing below:

Zabridgelabels.jpg

1: CO
2: XO
3: Counselor or diplomatic officer, depending upon availability and mission
4: Helm
5: Operations
6: Science
7: Tactical and security
8: Engineering

Other stations around the bridge are open and determined by mission operations and personnel present.