Za Main Engineering: Difference between revisions
Jump to navigation
Jump to search
(Created page with "{{Za-nav}} center The engineering section had a major upgrade during the last refit, upgrades were made to the warp drive and impulse engi...") |
m (categories) |
||
Line 5: | Line 5: | ||
The chief engineer's office can also be access through engineering. | The chief engineer's office can also be access through engineering. | ||
[[Category:USS Za|Main]] |
Latest revision as of 16:23, 1 December 2017
USS Za | ||
---|---|---|
INACTIVE STATUS | ||
| ||
The engineering section had a major upgrade during the last refit, upgrades were made to the warp drive and impulse engineers. New computer panels were installed and engineering was extended to provide space for the slipstream drive and open up extra engineering work spaces.
The chief engineer's office can also be access through engineering.