Thor Deck Layout/Main Engineering

From 118Wiki
Jump to navigation Jump to search



The Main engineering is a three-level complex. Within this area, the main warp core is centralized and that's where the dilithium chamber is. The main control for slipstream core is also housed here, below and aft of the main core. Though comprised of three separate decks, the central part of engineering is more of an open bay area with catwalks allowing access to the other decks. Enclosed rooms on the edges of engineering serve as the Chief Engineer’s office, offices for engineering personnel as needed, and meeting rooms for teams working on specific projects.

  • Engineering labs.
  • Two wholly enclosed and reinforced test bays near the forward part of the compartment serve as safe rooms for the testing of experimental or unknown tech as needed.