USS Discovery-B: Difference between revisions

Jump to navigation Jump to search
no edit summary
mNo edit summary
No edit summary
Line 7: Line 7:


The Discovery was constructed at Utopia Planitia in 2382 and was the first Ronin class vessel to be commissioned in Starfleet.
The Discovery was constructed at Utopia Planitia in 2382 and was the first Ronin class vessel to be commissioned in Starfleet.
{| border='2' cellspacing='0'
|-
!  style="background:pink; width:630px;" |<font color=#ffffff>'''Ronin Class Statistics'''</font>
{| border='1' cellspacing='0'
|-
! style="background:#E0FFFF; width:300px;" |'''Type'''
! style="background:#F0E68C; width:300px;" |'''Number'''
|-
|Registry Number
!NCC-31929-B 
|-
|Class
!Ronin
|-
|Crew Compliment
!Officers: 160<br>Enlisted Crew: 320
|-
|Civilians (Families)
!220
|-
|Maximum Capacity
!1000
|-
|Number of Decks (no pod)
!20
|-
|Height
!87 Metres
|-
|Width
!316.67 Metres
|-
|Length
!680 Metres
|-
|Beam
!240 Metres
|-
|Mass
!2500.000 Tons
|-
|Speed
!Normal Cruising: Warp 6.99<br>Emergency: Warp 9.99 (24 hours)
|-
|Strength Index
!1788
|-
|Expected Duration
!120 Years
|-
|Minor Refit Cycle
!10 Years
|-
|Major Refit Cycle
!5 Years
|-
|}
|}


{{118Fleet}}
{{118Fleet}}
5,268

edits

Navigation menu