DS285 Deck Allocation: Difference between revisions

Jump to navigation Jump to search
m
tweak
m (tweak)
m (tweak)
Line 5: Line 5:


All the engine and power generation sections project below the lower deck so that it can be ejected out into space in case of danger.  
All the engine and power generation sections project below the lower deck so that it can be ejected out into space in case of danger.  
=Main Sensory Arrays=


=Internal Docking Bays=
=Internal Docking Bays=
This facility has 2 internal docking bays on the upper half of the structure and 2 more placed in opposite locations on the lower half of the structure. Medium cruisers and smaller can enter these repair facilities. All other ships have to use the external docking facilities. Each docking bay is 100 meters (320 feet) high, 250 meters (800 feet) deep and 150 meters (480 feet) wide  
This facility has 2 internal docking bays on the upper half of the structure and 2 more placed in opposite locations on the lower half of the structure. Medium cruisers and smaller can enter these repair facilities. All other ships have to use the external docking facilities. Each docking bay is 100 meters (320 feet) high, 450 meters (1,440 feet) deep and 250 meters (800 feet) wide.




15,085

edits

Navigation menu