Independence-A Deck Layout: Difference between revisions

m
→‎Separated Deck Layout: middle sections connected cohesively in the table
m (→‎Separated Deck Layout: middle sections connected cohesively in the table)
Line 269: Line 269:
|-
|-
| 8  
| 8  
| style="background:CornflowerBlue" align="center"| Maintenance, Environmental Support, Docking Latches, Transporter Room 2, Aux. Tractor Emitter 2 || style="background:LightGreen" colspan="2" align="center"| Main Engineering Level 2, Auxiliary Bridge, Forward Torpedo Launcher, Docking Latches, Secondary Mess Hall, Crew Quarters, Life Support, Docking Hatches, Maintenance, Environmental Support, Deuterium Fuel Pumps and Fill Ports, Fuel Storage and Injector Reactors, Warp Core Docking Hatch, Tertiary Warp Core
| style="background:CornflowerBlue" colspan="2" align="center"| Maintenance, Environmental Support, Docking Latches, Transporter Room 2, Aux. Tractor Emitter 2 || style="background:LightGreen" align="center"| Main Engineering Level 2, Auxiliary Bridge, Forward Torpedo Launcher, Docking Latches, Secondary Mess Hall, Crew Quarters, Life Support, Docking Hatches, Maintenance, Environmental Support, Deuterium Fuel Pumps and Fill Ports, Fuel Storage and Injector Reactors, Warp Core Docking Hatch, Tertiary Warp Core
|-
|-
| 9
| 9