USS Phoenix-B: Difference between revisions

m
no edit summary
(Creation)
 
mNo edit summary
Line 92: Line 92:
* Bridge docking area, 9701.03; newest prototype of bridge design installed.
* Bridge docking area, 9701.03; newest prototype of bridge design installed.
* Deck 7, 9603.04; all apartement complexes removed and 3 holodecks and "The Globe" theater installed.
* Deck 7, 9603.04; all apartement complexes removed and 3 holodecks and "The Globe" theater installed.
* Deck 5, 9601.17; the main shuttle bay refitted (delayed due to requirement that the Phoenix attended a confrence at Camp Khitomer).
* Deck 5, 9601.17; the main shuttle bay refitted (delayed due to requirement that the Phoenix attended a conference at Camp Khitomer).
* Deck 15, 9512.19; junior officers training centers and lounges installed.
* Deck 15, 9512.19; junior officers training centers and lounges installed.
* Underside of star-drive hull, 9511.29; third tractor beam for ship installed.
* Underside of star-drive hull, 9511.29; third tractor beam for ship installed.
* Underside of saucer hull, 9511.30; second tractor beam for ship installed.
* Underside of saucer hull, 9511.30; second tractor beam for ship installed.
{{118LoD}}


[[Category:USS Phoenix|B]]
[[Category:USS Phoenix|B]]
[[Category:Lost or Decommissioned Ships|P]]
10,278

edits