Embassy of Duronis II/Grounds/Engineering Facilities: Difference between revisions

No edit summary
 
(22 intermediate revisions by 7 users not shown)
Line 1: Line 1:
{{embassybanner}}
{{Embassy of Duronis II}}
{{NewEmbassy}}
{{Expansion needed}}
The Engineering Department is responsible for the physical welfare of the [[Embassy of Duronis II]]. They ensure all systems are working within carefully defined parameters and that any systems that are not operating within tolerances are repaired. They also carry out standard maintenance, and innovation of the Embassy and Thunder's systems.


The Engineering Department is responsible for the physical welfare of the Embassy and the USS Thunder-A. They ensure that all systems are working within carefully defined parameters and that any systems that are not operating within tolerances are repaired. They also carry out standard maintenance, and innovation of the Embassy and Thunder's systems.
The Embassy has two main Engineering facilities. A dedicated building consists of primary power generation for the entire Embassy. Offices are available for the assigned Chief Engineer, as well as operation facilities for the Embassy computer, research and development labs, and subspace holocommunications.


==Embassy Facilities==
==Embassy’s Engineering and Maintenance area==  
The Embassy's engineering facilities are in two separate buildings: one is a series of engineering offices and the other contains Main Engineering and the Power Generating Facility.
[[Image:Embassyengineering.jpg|left|thumb|200px]]
This area is dominated by the main fusion reactor. The reactor requires monitoring and calibration hourly. The room is also used as general repair facility with work tables and spare parts scattered about.  


====Chief Engineer's Office====
[[Category:Embassy of Duronis II]]
The Chief Engineer's Office is located in the Main Engineering building.
[[Category:Embassy Complex]]
 
====Main Engineering====
Main Engineering is in its own building on the Embassy grounds. It is connected to the Power Generating Facilities and the Chief Engineer's office. There is also a briefing room with the main engineering section.
 
==USS Thunder-A Facilities==
 
====Chief Engineer's Office====
The Chief Engineer's Office comprises of several different displays around the room in accordance with different systems on board the Ronin.  Here, the Chief Engineer can see what is going on in the maintainance and the basic running of the ship.  It is a room where the CEO can work privately.
 
====Main Engineering====
[[Image:AKiraPool.gif|thumb|left|Akira Main Pool Table]]
 
Officially located on Deck 15 of the [[USS Thunder|Thunder]], Main Engineering is the thriving heart of any vessel in space. As almost every system of the vessel can be accessed from here, the main hub of the department also spans over decks 14 and 16. Here further system access or workspace in the form of engineering and manufacturing labs is provided for the vessels large technical crew complement. Those systems too small, complex and far from the Thunder’s engineering hub to justify a physical connection, are remotely monitored in real-time via an independent network of sensors. In general any system status, be it repair management, power flow or simply progress of general maintenance can be drawn on from here.
 
As Main Engineering supplies all systems with power and monitors every major system needed by the crew during the day to day running of the ship, this complex mesh of sensors are the eyes and ears of the engineers stationed here. If something fails, Engineering will have likely noticed and responded before the problem becomes uncontrollable.  It is arguably the most important area of the ship though not the most remembered. 
 
Due to the size of the Thunder-A’s engineering hub, it also has a decent compliment of secondary and special access routes in and out of Engineering to take into account. This is perhaps one of the reasons why Engineers never seem to leave the drive room, though also provides a tactical nightmare when defending this vital ship section from intruders. For this reason the Thunder-A’s entire engineering cavern, spanning three decks, can be completely locked down via a combination of conventional blast doors and high level security fields.
 
== Warp System ==
 
The Thunder-A’s main form of propulsion is provided by the same M/ARA system that is found on each of the Federation’s vessels. The original Akira design instrumentalized a standardized RamJet Mark 1 Standard M/AMRD, however, improvements in warp theory, geometry, materials design and construction processes have been combined with experiences gathered over the last quarter of a century since the Akira class has been in service. These insights have led to a hybrid of the class 7 and 8 M/ARA of the Defiant and Sovereign classes respectively.
 
The class 7 beta of General Electric features the multi-lobed magnetic constriction segments, premiered in the class 7 and 8 designs. The USS Thunder-A utilizes a type 7a M/ARA, which is in effect a beefed up class 7, implementing four matter streams (one main stream with three secondary reactant columns.) The computer controlled dilithium articulation chamber used on the Sovereign class also finds application aboard the Thunder-A. The increase in reaction efficiency further complements the vessel’s power production.
 
== Experimental Technology ==
[[Image:GW614H191.jpg|thumb|200px|left|Akira-Class Schematics]]
 
Although the section isn’t exactly what it says on the tin, some of the Engineers on the Thunder-A have at some point been involved in technology research at Utopia Planitia. Using the resources and multiple opinions available to them, the Engineers on board are able to carry on research into a wide variety of deep space systems, including advancements in the LCARS system and an experimental EEH (Emergency Engineering Hologram).
 
Continued research into these systems has not had a direct benefit on the Ronin as of yet.  No advancements have been made as much of the research hasn’t left the library.  However, they’re forever hopeful.
 
Typical crew compliment in Main Engineering consists of twenty engineers and forty technicians of various grades. During Red or Yellow Alert, that number is increased. Perhaps a single fact about the Thunder is the senior ‘team’ they have, unlike other departments. Due to Engineering being such a vast department, it seemed necessary to have subsection departmental heads, working effectively. It hasn't failed yet
 
==SENIOR OFFICERS==
 
{{Roster
|SHIP = Embassy Operations
|FIRST = Engineering|COLOR = Gold|
{{Officer|Ensign|Oddas Aria|Gold|Engineering Officer|STYLE=Slanted}}|
{{Officer|Ensign|Laura Baxter|Gold|Engineering Officer|STYLE=Slanted}}
|}}
 
==STAFF OFFICERS==
{{NPCRoster
|SHIP = Embassy Engineering Staff
|<onlyinclude>
|{{No Link NPC|Chief Petty Officer|Arakov||Gold|Engineering CPO||}}
|{{No Link NPC|Petty Officer Third Class|Gaworra||Gold|Engineering PO||}}
|{{No Link NPC|Crewman Second Class|Cunes Dadek||Gold|Engineering Crewman||}}
|}}

Latest revision as of 13:44, 21 January 2020

Memory118.png
This article or section is incomplete
This page is missing sections of information that may be filled using 118 canon encounters, or further detail from Memory Alpha. Feel free to edit this page to include new information, using the reference tool (<ref>) where possible.


The Engineering Department is responsible for the physical welfare of the Embassy of Duronis II. They ensure all systems are working within carefully defined parameters and that any systems that are not operating within tolerances are repaired. They also carry out standard maintenance, and innovation of the Embassy and Thunder's systems.

The Embassy has two main Engineering facilities. A dedicated building consists of primary power generation for the entire Embassy. Offices are available for the assigned Chief Engineer, as well as operation facilities for the Embassy computer, research and development labs, and subspace holocommunications.

Embassy’s Engineering and Maintenance area

This area is dominated by the main fusion reactor. The reactor requires monitoring and calibration hourly. The room is also used as general repair facility with work tables and spare parts scattered about.