Quantum Slipstream Drive: Difference between revisions

m
no edit summary
(Rewording, clean-up, etc.)
mNo edit summary
Line 13: Line 13:


==Warm-up time==
==Warm-up time==
Starfleet slipstream drives require a warm-up cycle before they can be engaged. This warm-up cycle requires 40-minutes of preparation by a trained Starfleet Engineering Officer.  
Starfleet slipstream drives require a warm-up cycle before they can be engaged. This warm-up cycle requires 40 minutes of preparation by a trained Starfleet Engineering Officer.  


==Cool-down time==
==Cool-down time==
404

edits