Thor Deck Layout/Main Engineering

From 118Wiki
< Thor Deck Layout
Revision as of 21:43, 8 June 2017 by Toni (talk | contribs) (Thor Engineering)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Deck_Layout

The Main engineering is a three-level complex that spans decks 11-13 across the length and width of the ship. Within this area, the main warp core is centralized. The slipstream core is also housed here, below and aft of the main core, with restricted access on deck 13. Though comprised of three separate decks, the central part of engineering is more of an open bay area with catwalks allowing access to the other decks. Enclosed rooms on the edges of engineering serve as the Chief Engineer’s office, offices for engineering personnel as needed, and meeting rooms for teams working on specific projects.

  • Engineering labs and holo suites are located on the outskirts as well.
  • Two wholly enclosed and reinforced test bays near the forward part of the compartment serve as safe rooms for the

testing of experimental or unknown tech as needed.