Thor Deck Layout/Main Engineering: Difference between revisions

From 118Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
{{USS_Thor}}
{{USS_Thor}}
Main engineering is a three-level complex that spans decks 11-13 across the length and width of the ship. Within this area, the main warp core is centralized. The slipstream core is also housed here, below and aft of the main core, with restricted access on deck 13. Though comprised of three separate decks, the central part of engineering is more of an open bay area with catwalks allowing access to the other decks. Enclosed rooms on the edges of engineering serve as the Chief Engineer’s office, offices for engineering personnel as needed, and meeting rooms for teams working on specific projects.  
</p>
Engineering labs and holosuites are located on the outskirts as well. Two wholly enclosed and reinforced test bays near the forward part of the compartment serve as safe rooms for the  
 
The Main engineering is a three-level complex that spans decks 11-13 across the length and width of the ship. Within this area, the main warp core is centralized. The slipstream core is also housed here, below and aft of the main core, with restricted access on deck 13. Though comprised of three separate decks, the central part of engineering is more of an open bay area with catwalks allowing access to the other decks. Enclosed rooms on the edges of engineering serve as the Chief Engineer’s office, offices for engineering personnel as needed, and meeting rooms for teams working on specific projects.  
*Engineering labs and holo suites are located on the outskirts as well.  
*Two wholly enclosed and reinforced test bays near the forward part of the compartment serve as safe rooms for the  
testing of experimental or unknown tech as needed.
testing of experimental or unknown tech as needed.

Revision as of 21:41, 8 June 2017

Deck_Layout

The Main engineering is a three-level complex that spans decks 11-13 across the length and width of the ship. Within this area, the main warp core is centralized. The slipstream core is also housed here, below and aft of the main core, with restricted access on deck 13. Though comprised of three separate decks, the central part of engineering is more of an open bay area with catwalks allowing access to the other decks. Enclosed rooms on the edges of engineering serve as the Chief Engineer’s office, offices for engineering personnel as needed, and meeting rooms for teams working on specific projects.

  • Engineering labs and holo suites are located on the outskirts as well.
  • Two wholly enclosed and reinforced test bays near the forward part of the compartment serve as safe rooms for the

testing of experimental or unknown tech as needed.