Phoenix-B Refit Log

From 118Wiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Recent Changes and Refittings

  • 9908.22: Computer cores begin experiencing cascading failures. Ship placed in drydock with no plans to re-launch the ship. The USS Tiger takes the place of the Phoenix - B as the StarBase's new field ship.
  • 9812.10 - 9901.12: Computer cores fully replaced after corruption found in retreival systems.
  • 9807.18 - 9807.23: Port side warp nacelle replaced after fatal flaw found in bussard ramscoop.
  • 9802.15 - 9803.02: Sensor pod removed, sensor pod docking clamps refitted with newest model, new sensor pod installed.
  • 9705.01 - 9710.27: Phoenix undergoes complete overhaul after Maquis attack.
  • Bridge docking area, 9701.03; newest prototype of bridge design installed.
  • Deck 7, 9603.04; all apartement complexes removed and 3 holodecks and "The Globe" theater installed.
  • Deck 5, 9601.17; the main shuttle bay refitted (delayed due to requirement that the Phoenix attended a conference at Camp Khitomer).
  • Deck 15, 9512.19; junior officers training centers and lounges installed.
  • Underside of star-drive hull, 9511.29; third tractor beam for ship installed.
  • Underside of saucer hull, 9511.30; second tractor beam for ship installed.