Challenger-A Deck Layout

Revision as of 14:10, 29 May 2009 by Canreb (talk | contribs)

24 decks to work on Finished so far deck 1 to


DECK TOUR
DECK ATTRIBUTES
1
2
3
4
5
6
  • Primary Computer Core Control
  • Cargo Bay 1 & 2 Cargo Bay 1 & 2
  • Upper Primary Computer Cores 1-2
  • Upper Main Shuttlebay
  • Impulse Engines (P/S)
7
8
  • Primary Computer Core
  • Junior Officers and Crew Quarters
  • Secondary Science Labs Secondary Science Labs
  • Firing Range
  • Main Impulse Engines
  • Phaser Range
  • Chief Tactical Officer's Office
  • Main Brig
  • Secondary Weapons Control
  • Secondary Armory
  • Upper Shuttlebay Maintenance and Support
  • Upper Aft Lounge
  • Transporter Rooms 1-2
9
  • Crew Quarters
  • Main Lounge "Mission Control
  • Recreation Deck
  • Holodecks
  • Dorsal Docking Port
  • Environmental Support
  • Transporter Rooms 3-4
  • Lower Shuttlebay Maintenance and Support
  • M/ARA Deuterium Injector Assembly
  • Aft Lounge
10
11
  • Primary Computer Core
  • Shuttle Maintenance
  • Hangar and Storage
  • Main Engineering
  • Primary Maintenance Support Center
  • Fore Torpedo Bay Control
  • Living Quarters
  • Hydroponics
  • Stellar Cartography
  • Deflector Control
  • Secondary Navigational Deflector
12
  • Lower Engineering
  • Primary Systems Support Compartment
  • Environmental Support
  • Living Quarters
  • Forward Torpedo Magazine
13
  • Fore and Aft Torpedo Bay Control
  • Torpedo Magazine and Manufacturing Area
  • Shuttle and Fighter Hangar Elevator Support Systems
  • Primary Shield Generators Deck 13: Living Quarters, Deuterium Storage, Power Distribution, Operations Department Office, Forward Torpedo Launcher (1)
14
15
16
  • Shuttlebay
  • Shuttlebay Access (fore and aft) Deck 16: Secondary Computer Core, Primary Shuttle Maintenance Hangar, Tertiary Science Labs, Navigational Deflector, Main Engineering Lower Level
17
18
19


20
  • Lower Engineering
  • Deflector Control
  • Main Tractor Beam Control and Emitter
  • Environmental Control
  • Secondary Computer Core
  • Null-G
  • Brig Brig
  • Armory
  • Power Transfer Conduit Control Center
  • Environmental Support
  • Forward Torpedo Launchers (2)
  • Torpedo Magazine
21
22
23
  • Antimatter Injector Assembly
  • Anti-matter Storage Pods
  • Anti-matter Injection Reactors
24
  • Antimatter Injector Assembly
  • Anti-matter Storage Pods
SOURCES USED:
  • 1)Star Trek: The Next Generation Technical Manual - Rick Sternbach and Michael Okuda
  • 2)Star Trek: Deep Space Nine Technical Manual - Herman Zimmerman, Rick Sternbach and Doug Drexler
  • 3)Star Trek: The Magazine
  • 4)Star Trek: First Contact
  • 5)Star Trek: Insurrection
  • 6)Star Trek: Nemesis
  • 7)Starfleet Technical Manual - Franz Joseph
  • 8)Star Trek Starfleet Chronology - Stan Goldstein, Fred Goldstein, Rick Sternbach
  • 9)Star Trek: Bridge Commander
  • 10)Star Trek: Starfleet Starship Spotter – Adam Lebowitz, Robert Bonchune