Thor Deck Layout/Main Engineering

< Thor Deck Layout
Revision as of 06:11, 11 July 2019 by Sky Blake (talk | contribs) (Sky Blake moved page Thor Main Engineering to Thor Deck Layout/Main Engineering: Connecting to main page)


The Main engineering is a three-level complex that spans decks 11-13 across the length and width of the ship. Within this area, the main warp core is centralized. The slipstream core is also housed here, below and aft of the main core, with restricted access on deck 13. Though comprised of three separate decks, the central part of engineering is more of an open bay area with catwalks allowing access to the other decks. Enclosed rooms on the edges of engineering serve as the Chief Engineer’s office, offices for engineering personnel as needed, and meeting rooms for teams working on specific projects.

  • Engineering labs and holo suites are located on the outskirts as well.
  • Two wholly enclosed and reinforced test bays near the forward part of the compartment serve as safe rooms for the testing of experimental or unknown tech as needed.