Challenger-A Deck Layout: Difference between revisions

From 118Wiki
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
Line 147: Line 147:
*Shuttle and Fighter Hangar Elevator Support Systems
*Shuttle and Fighter Hangar Elevator Support Systems
*[[Challenger Primary Shield Generators|Primary Shield Generators]] Deck 13:  Living Quarters, Deuterium Storage, Power Distribution, Operations Department Office,  
*[[Challenger Primary Shield Generators|Primary Shield Generators]] Deck 13:  Living Quarters, Deuterium Storage, Power Distribution, Operations Department Office,  
*[[Sovereign Class Torpedo Launcers|Forward Torpedo Launcher (1)]]   
*[[Sovereign Class Torpedo Launchers|Forward Torpedo Launcher (1)]]   


|-
|-
Line 198: Line 198:
*[[Challenger Chief Tactical Officer's Office|Chief Tactical Officer's Office]]
*[[Challenger Chief Tactical Officer's Office|Chief Tactical Officer's Office]]
*[[Challenger Main Engineering|Chief Engineer's Office/Station]] Deck 19:  Transporter Rooms 5 and 6, Waste Management, Environmental Support,  
*[[Challenger Main Engineering|Chief Engineer's Office/Station]] Deck 19:  Transporter Rooms 5 and 6, Waste Management, Environmental Support,  
*[[Sovereign Class Torpedo Launcers|Aft Torpedo Launchers (2)]]
*[[Sovereign Class Torpedo Launchers|Aft Torpedo Launchers (2)]]
*Torpedo Magazine
*Torpedo Magazine


Line 216: Line 216:
*Power Transfer Conduit Control Center  
*Power Transfer Conduit Control Center  
*Environmental Support  
*Environmental Support  
*[[Sovereign Class Torpedo Launcers|Forward Torpedo Launchers (2)]]  
*[[Sovereign Class Torpedo Launchers|Forward Torpedo Launchers (2)]]  
*Torpedo Magazine
*Torpedo Magazine
|-
|-

Revision as of 17:17, 30 May 2009

24 decks to work on

  • Finished so far are deck 1 to 4


DECK TOUR
DECK ATTRIBUTES
1
2
3
4
5
6
  • Primary Computer Core Control
  • Cargo Bay 1 & 2 Cargo Bay 1 & 2
  • Upper Primary Computer Cores 1-2
  • Upper Main Shuttlebay
  • Impulse Engines (P/S)
7
8
9
10
11
  • Primary Computer Core
  • Shuttle Maintenance
  • Hangar and Storage
  • Main Engineering
  • Primary Maintenance Support Center
  • Fore Torpedo Bay Control
  • Living Quarters
  • Hydroponics
  • Stellar Cartography
  • Deflector Control
  • Secondary Navigational Deflector
  • Primary Torpedo/Probe Magazine
12
  • Lower Engineering
  • Primary Systems Support Compartment
  • Environmental Support
  • Living Quarters
  • Forward Torpedo Magazine
13
  • Fore and Aft Torpedo Bay Control
  • Torpedo Magazine and Manufacturing Area
  • Shuttle and Fighter Hangar Elevator Support Systems
  • Primary Shield Generators Deck 13: Living Quarters, Deuterium Storage, Power Distribution, Operations Department Office,
  • Forward Torpedo Launcher (1)
14
15
16
17
18
19


20
21
22
23
  • Antimatter Injector Assembly
  • Anti-matter Storage Pods
  • Anti-matter Injection Reactors
24
  • Antimatter Injector Assembly
  • Anti-matter Storage Pods



SOURCES USED:

  • 1)Star Trek: The Next Generation Technical Manual - Rick Sternbach and Michael Okuda
  • 2)Star Trek: Deep Space Nine Technical Manual - Herman Zimmerman, Rick Sternbach and Doug Drexler
  • 3)Star Trek: The Magazine
  • 4)Star Trek: First Contact
  • 5)Star Trek: Insurrection
  • 6)Star Trek: Nemesis
  • 7)Starfleet Technical Manual - Franz Joseph
  • 8)Star Trek Starfleet Chronology - Stan Goldstein, Fred Goldstein, Rick Sternbach
  • 9)Star Trek: Bridge Commander
  • 10)Star Trek: Starfleet Starship Spotter – Adam Lebowitz, Robert Bonchune